Case studies

What CCM caught, and what it saved.

Seven cases from vessels using CCM: failures that could have been avoided, wear caught early, and maintenance planned on condition.

CCM-001Nov 2024
Piston ring failure

Could this engine failure have been avoided?

A leaking injector went unnoticed between port inspections and broke a top piston ring at sea.

CCM-002Nov 2024
Scavenge space

Scavenge space monitoring & proactive maintenance

Monthly images exposed which vessels kept scavenge spaces clean and which didn’t, and changed crew behaviour.

CCM-003Dec 2024
Early detection

Early detection prevents a major breakdown

Rising iron in drain oil on Unit 1 pointed to scuffing rings, caught at sea and fixed at the next port.

CCM-004Sep 2025
Liner ovality

Why new piston rings failed within months

Rings were renewed on an oval liner. Without honing or replacement, they could not seat and failed early.

CCM-005Sep 2025
Lube oil

Optimising cylinder lube-oil consumption

Visual evidence showed wet rings at 1.2 g/kWh: 20% over-lubrication that CCM benchmarking brought back to condition.

CCM-006Sep 2025
TBO forecast

Predicting time between overhauls

Time-based planning said 25% ring life left. Condition-based forecasting said 74.5%, with replacement due in July 2027.

CCM-007Sep 2025
Running-in

Correct running-in procedures prolong ring life

Controlled load steps let new rings bed in. CCM images from April to August 2025 prove it.